Board of Directors Accomplishments 2015

These are just a few of the Boards accomplishments in maintaining Beautiful Four Seasons Condominium Association at Winter Park, Inc.:

  • In 2015 the community replaced 3 roofs; building 3300,2900 and the Clubhouse. A new roofing under-layment product was applied for these installations allowing for a 20 year labor and leak warranty.
  • The remaining globes on the Sternberg pole lights were replaced.
  • A complete landscape replacement was achieved at the building 2300 and 2400.
  • Wrought iron gates with automatic hydraulic shuts were installed on all 3 laundry rooms for the safety of all our residents.
  • A new section of wrought iron fencing was installed on the top platform of the pool pump room that is located at the southwest pool known as the family pool or pool number 3.
  • Approximately 450 square feet of concrete sidewalk in various areas were replaced. This created a better curb appeal of the community.
  • There were 595 pairs of wooden shutters installed.  This project started in 2014 and was completed early 2015.  Replacement of the shutters led to replacement of all condo unit numbers at the entrances with cast aluminum product from White Hall (White Hall is a high-end provider of home builders products).
  • The pass-through areas in front of 19 stairways were replaced.
  • The guest-suite at the Clubhouse bathrooms were remodeled.
  • There were 8 ‘Doggie Stations’ installed throughout the community for residents to pickup after their pet waste.
  • The north and south side of the tennis court windscreen were replaced.